Is a supplier you depend on already on a path to failure?
Distress, an ownership change, a stalled connection — these form on the public record before they reach you. From inside the programme, the first you hear of it is when delivery stops.
Settled as the Supplier Watch Evidence PackPoint-in-time checks go stale the day after you run them. A counterparty can change hands, draw a sanction, or stall in the connection queue — and the gap between the event and your awareness is time you’re still committed to them.
Whether you’d see the failure before it reaches you.
Typical reader: a supply-chain & procurement director.
Which projects advance, and which stall, is now on the record.
On 8 December 2025 NESO confirmed a reformed pipeline that reshuffles a queue of more than 700 GW — prioritising 283 GW of generation and storage and 99 GW of transmission-connected demand, while more than 300 GW does not move forward. Which suppliers and projects are advancing, and which are stalling, is now visible on the public record — if you’re reading it. See what changed →